Summary:

The building chosen for this thesis is the new Boston Arts Academy located in Boston, MA. The high school’s existing building is to be demolished and reconstructed on the same footprint. The new building will be an education/mixed use building, with a total square footage of 154,333 ft2 . This 5-story structure will include a variety of spaces such as academic classrooms, science classrooms, visual arts rooms, fitness rooms, filming/screening rooms, administrative offices, dining commons, and a kitchen. In addition, there will be large special spaces such as a gymnasium, auditorium, band recital hall, and an outdoor terrace on the fifth floor. This report encompasses the building’s year-long study. This process progressed from the understanding of the building’s existing conditions to the final development of architectural engineering designs. The report contains the following in detail:

o Lighting design solutions which were carefully developed to satisfy qualitative and quantitative design criteria. The four spaces which underwent lighting analysis and redesign are the building’s recital hall, outdoor terrace, main circulation space, and auditorium. The lighting design solution of the auditorium involved a change in the architecture. To insure the improvement in both aesthetics and function of the space an acoustical analysis was performed.

 

o Comprehensive study of the buildings electrical system including voltage drop and short circuit study. As well as, system design modifications such as transformer layout redesign and conduit material replacement.

 

o Cost comparisons between original and modified electrical system designs to prove that the design alterations are both reliable and cost effective.

 

The Boston Arts Academy encourages children to tap into their greatest artistic potential. Since this building is servicing the future of culture and change it is important to design for them to the best of our ability.

News Feed

Sent out personal and AE department "Thank You" notes

8/20/2018

Became career fair student host

8/25/2018

Resume submitted to AE career fair listing

8/27/2018

CPEP website posting

9/4/2018

Full functionality of CPEP website

9/10/2018

Uploaded Tech report 1B

9/24/2018

Updated building statistics 

10/1/2018

Submitted tech report 2

10/22/2018

Submitted tech report 3

11/16/2018

Submitted final proposal

12/7/2018

Lutron presentation 12/3/2018

Added Abstract to website 10/26/2018

Added building statistics pt2 to website

10/17/2018

Submitted building abstract 

9/29/2018

Added about me page

9/14/2018

Uploaded Tech report 1A

9/5/2018

Submitted building statistics part 1 draft

8/30/2018

 Turned in initiation checklist 2

8/27/2018

Attended CPEP seminar

8/22/2018

Turned in initiation checklist 1 & confirmed master list information

8/20/2018

Obtained Owner Permission and CDs

7/25/2018

2018

2019

Finalist Thesis Presentation 4/26/2019

Final Thesis Presentation 4/11/2019

Final Report Submitted 4/1/2019

L/E Draft 2 Progress Submission 3/15/2019

L/E Draft 1 Progress Submission

2/16/2019 

Final Thesis Proposal Revised 

1/14/2019 

Milestones Submission

2/14/2014

Milestones Submission

3/14/2014

Slide outline submission 3/27/2019  

Final Presentation Submission

4/8/2018

Electrical trip to EATON 4/16/2019