top of page

News Feed

Sent out personal and AE department "Thank You" notes

8/20/2018

Became career fair student host

8/25/2018

Resume submitted to AE career fair listing

8/27/2018

CPEP website posting

9/4/2018

Full functionality of CPEP website

9/10/2018

Uploaded Tech report 1B

9/24/2018

Updated building statistics 

10/1/2018

Submitted tech report 2

10/22/2018

Submitted tech report 3

11/16/2018

Submitted final proposal

12/7/2018

Lutron presentation 12/3/2018

Added Abstract to website 10/26/2018

Added building statistics pt2 to website

10/17/2018

Submitted building abstract 

9/29/2018

Added about me page

9/14/2018

Uploaded Tech report 1A

9/5/2018

Submitted building statistics part 1 draft

8/30/2018

 Turned in initiation checklist 2

8/27/2018

Attended CPEP seminar

8/22/2018

Turned in initiation checklist 1 & confirmed master list information

8/20/2018

Obtained Owner Permission and CDs

7/25/2018

2018

2019

Finalist Thesis Presentation 4/26/2019

Final Thesis Presentation 4/11/2019

Final Report Submitted 4/1/2019

L/E Draft 2 Progress Submission 3/15/2019

L/E Draft 1 Progress Submission

2/16/2019 

Final Thesis Proposal Revised 

1/14/2019 

Milestones Submission

2/14/2014

Milestones Submission

3/14/2014

Slide outline submission 3/27/2019  

Final Presentation Submission

4/8/2018

Electrical trip to EATON 4/16/2019

bottom of page